‘APC’ Category

 

全新PB0-100题库学习指南

最新的PB0-100题库资料

科目代码: PB0-100
问题数量: 115

更新时间: 2009-09-11
报名地点: Prometric/Pearson VUE
考试全称: APC NCPI Design

PB0-100考试是APC公司的APC NCPI Design认证考试官方代号,Examsoon的PB0-100权威考试题库软件是APC认证厂商的授权产品,Examsoon 绝对保证第一次参加PB0-100考试的考生即可顺利通过!

Examsoon 的优势

1.Examsoon 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
2.该测试已取得试题持有者和第三方的授权,我们深信IT业的专业人员和经理人有能力保证被授权产品的质量。
3.如果你使用 Examsoon 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
4.提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性.

PB0-100考试是APC厂商最热门的科目,其考试的全称为:APC NCPI Design。在此我们收集了不同题库供应商的真题集 包含 : examsoon PB0-100培训资料 ,Testinside PB0-100考题讲解, Pass4sure PB0-100题库 , Testking PB0-100考试指南, exam4sure 真题材料.只要仔细阅读以下的PB0-100题库demo的问题和答案, 相信你就会知道这个题库的质量了。

PB0-100题库由多位IT认证的专家亲自整理的考试全真试题材料,为了让大家花更少的时间来完成APC PB0-100考试. examsoon考题大师PB0-100试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加PB0-100考试,我们保证您一次轻松通过考试;

PB0-100题库问题与答案赏析

更多信息请访问: PB0-100题库

 
 
 

全新DU0-001题库学习指南

最新的DU0-001题库资料

科目代码: DU0-001
问题数量: 243

更新时间: 2009-09-14
报名地点: Prometric/Pearson VUE
考试全称: Data Center University Associate Certification

DU0-001考试是APC公司的Data Center University Associate Certification认证考试官方代号,Examsoon的DU0-001权威考试题库软件是APC认证厂商的授权产品,Examsoon 绝对保证第一次参加DU0-001考试的考生即可顺利通过!

Examsoon 的优势

1.Examsoon 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
2.该测试已取得试题持有者和第三方的授权,我们深信IT业的专业人员和经理人有能力保证被授权产品的质量。
3.如果你使用 Examsoon 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
4.提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性.

DU0-001考试是APC厂商最热门的科目,其考试的全称为:Data Center University Associate Certification。在此我们收集了不同题库供应商的真题集 包含 : examsoon DU0-001培训资料 ,Testinside DU0-001考题讲解, Pass4sure DU0-001题库 , Testking DU0-001考试指南, exam4sure 真题材料.只要仔细阅读以下的DU0-001题库demo的问题和答案, 相信你就会知道这个题库的质量了。

DU0-001题库由多位IT认证的专家亲自整理的考试全真试题材料,为了让大家花更少的时间来完成APC DU0-001考试. examsoon考题大师DU0-001试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加DU0-001考试,我们保证您一次轻松通过考试;

DU0-001题库问题与答案赏析

更多信息请访问: DU0-001题库

 
 
 

全新PB0-200题库学习指南

最新的PB0-200题库资料

科目代码: PB0-200
问题数量: 115

更新时间: 2009-09-07
报名地点: Prometric/Pearson VUE
考试全称: APC NCPI Design

PB0-200考试是APC公司的APC NCPI Design认证考试官方代号,Examsoon的PB0-200权威考试题库软件是APC认证厂商的授权产品,Examsoon 绝对保证第一次参加PB0-200考试的考生即可顺利通过!

Examsoon 的优势

1.Examsoon 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
2.该测试已取得试题持有者和第三方的授权,我们深信IT业的专业人员和经理人有能力保证被授权产品的质量。
3.如果你使用 Examsoon 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
4.提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性.

PB0-200考试是APC厂商最热门的科目,其考试的全称为:APC NCPI Design。在此我们收集了不同题库供应商的真题集 包含 : examsoon PB0-200培训资料 ,Testinside PB0-200考题讲解, Pass4sure PB0-200题库 , Testking PB0-200考试指南, exam4sure 真题材料.只要仔细阅读以下的PB0-200题库demo的问题和答案, 相信你就会知道这个题库的质量了。

PB0-200题库由多位IT认证的专家亲自整理的考试全真试题材料,为了让大家花更少的时间来完成APC PB0-200考试. examsoon考题大师PB0-200试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加PB0-200考试,我们保证您一次轻松通过考试;

PB0-200题库问题与答案赏析

 
 
Exam : APC PB0-200
Title : APC NCPI Design

1. What are two reasons why a fully rated UPS (output kW = output kVA) is more compatible with today’s IT loads than an 80%-rated UPS (output kW = output kVA at a 0.8 power factor)? (Choose two.)
A. 80%-rated UPSs are more efficient.
B. Today’s IT loads are power-factor corrected.
C. Fully-rated UPSs have superior output voltage control.
D. Fully-rated UPSs make it less likely to undersize the UPS.
E. Today’s IT loads lock up when powered by an 80%-rated UPS.
Answer: BD

2. How do you achieve full system redundancy in a precision air conditioning system?
A. install multiple air conditioning systems in an N+1 configuration
B. install a properly-sized DX air cooled unit with chilled water back-up
C. install a properly-sized air conditioning unit with redundant compressors
D. install Building System cooling (comfort cooling) with an air conditioning unit in standby
Answer: A

3. A company has an existing data center where the temperature does not go below 27?Celsius (80?Fahrenheit). There are hot spots in the data center where the temperature is even higher. There is one 40kW chilled-water unit and 60kW of IT heat load in the space. The customer wants to reduce the temperature to 22?Celsius (72?Fahrenheit) and provide N+1 redundancy. What is the most reliable and cost-effective solution?
A. add one 40kW chilled-water unit
B. add two 60kW chilled-water units
C. add two 40kW chilled-water units
D. add one 40kW refrigerant-based unit
E. add one 60kW refrigerant-based unit
Answer: C

4. What is the most accurate way to determine the capacity of an existing standby generator?
A. ask the facility manager
B. calculate 30% over the UPS capacity
C. look at the generator name plate in the genset room
D. calculate capacity based on the load the generator is powering
Answer: C

5. A site requires redundant power feeds to single-corded servers. What is a possible redundant configuration?
A. two single-module UPSs feeding one rack-mount Automatic Transfer Switch and one outlet strip per rack
B. two single-module UPSs each feeding dual-panel distribution boards, which in turn feed two outlet strips per rack
C. two single-module UPSs each feeding two outlet strips per rack; plugging half the servers in one strip and the other half in another strip
D. two single-module UPSs each fed from separately derived utility sources; sources that come from one of two independent utility substations
Answer: A

6. An IT manager wants one hour of UPS runtime on a Voice over IP (VoIP) solution that will be located in a small wiring closet. To get the full hour of runtime and continuous operation, what else must be in place?
A. The closet must have sufficient cooling for that period.
B. Shutdown software should be loaded on the VoIP server.
C. The UPS must be oversized in wattage to provide this runtime.
D. The equipment must be installed in a full enclosure for proper security.
Answer: A

7. Which two products are appropriate for an IT network wiring closet? (Choose two.)
A. single-phase UPS
B. 800 amp DC rectifier
C. 4-post open frame rack
D. 10kVA three-phase UPS
E. 15-ton computer room air conditioner
Answer: AC

8. A company has a 30kW N+1 InfraStruXure solution in their small data center. In the event of a power module failure, it wants e-mail notification that there is a loss of redundancy. The only connection is a LAN connection for monitoring. What should you do?
A. using the InfraStruXure Manager, connect into the RJ45 port and configure the e-mail notification feature
B. using an Out of Band Management Card, connect into an external modem and configure the e-mail notification feature
C. using the serial port on the UPS, connect the UPS solution to a desktop computer and configure the e-mail notification feature
D. using the Building Management Card, connect the UPS solution to the facility Building Management software and configure the e-mail
notification feature
Answer: A

9. A remote office for a small business has 20 employees. Its IT equipment supports four file servers, e-mail, storage, and Internet access. Which three products are appropriate for this office’s IT room that has no IT staff? (Choose three.)
A. 30kW N+1 UPS
B. 12kVA N+1 UPS
C. 4-post rack
D. 15-ton computer room air conditioner
E. remote security and environmental monitoring
Answer: BCE

10. You have specified that a 1000 VA rack-mount UPS solution be added to your client’s existing data center. Considering the size of the UPS, which service product is appropriate?
A. Load Bank
B. Thermography
C. Extended Warranty
D. Preventive Maintenance
Answer: C

11. What is a common application for 2-post racks?
A. telecom
B. server room
C. remote office
D. IT data center
Answer: A

12. If a company requests that its UPS output power be distributed to the racks through an isolation transformer, what are they trying to do?
A. decrease the cable size to the load
B. increase the efficiency of the system
C. increase availability throughout the data center
D. prevent electrical noise from locking up the servers
Answer: D

13. Click the Calculator button. A medium-size data center has been retrofitted and the new IT equipment requires 39kW at a power factor 0.90. The existing UPS system is 40kVA. Which two actions should you take? (Choose two.)
A. keep the actual UPS system: 40kVA means 40kW
B. replace the diesel generator to cover the extra load
C. replace the actual UPS system with a minimum 45kVA
D. check the entire UPS installation to make sure it is able to support the new load
Answer: CD

14. A data center with raised-floor air distribution has hot spot problems in the equipment racks closest to the air conditioners. What are two possible solutions to this problem? (Choose two.)
A. moving the racks closer to the air conditioners
B. increasing airflow rate from the air conditioners
C. moving the racks away from the air conditioners
D. decreasing airflow rate from the air conditioners
Answer: CD